Joist Hanger TOP M Installation aid
Are you a customer or a new customer? (Specialist trade) | ||
For more information about our products, orders, invoices and promotions, log in to our new shop system (account above). |
Version: | aussenliegend |
ETA-08/0264: | ETA-08 0264 |
Wide mm: | 100 |
Height mm: | 140 |
Depth mm: | 70 |
Thickness mm: | 1,5 |
Netto Gewicht Kg: | 27,4 |
Secondary beam2 Ø 5: | 12 |
Secondary/main beam Ø 11: | 4 |
Main beam Ø 5: | 22 |
GreenLine: | GreenLine |
TopLine: | TopLine |
Material: | S 250 GD +Z 275 |
Use class: | NKL 2 |
Application: | Holz/Holz+Holz/OSB+Holz/Beton |
DC Statik: | JA |
Made in Germany: | JA |
Statics diagram: | Balkenschuhe |
Gruppe: | Balkenschuhe |
ETA: | ETA-08 0264 |
ID | Quantity | Wide mm | Height mm | Depth mm | Thickness mm | Secondary beam2 Ø 5 | Secondary/main beam Ø 11 | Main beam Ø 5 | |||
---|---|---|---|---|---|---|---|---|---|---|---|
|
30601TOPM |
|
40 | 110 | 70 | 1,5 | 8 | 2 | 14 | ||
|
30602TOPM |
|
45 | 108 | 70 | 1,5 | 8 | 2 | 14 | ||
|
30603TOPM |
|
51 | 105 | 70 | 1,5 | 8 | 2 | 14 | ||
|
30502TOPM |
|
60 | 100 | 70 | 1,5 | 8 | 2 | 14 | ||
|
30609TOPM |
|
60 | 130 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30604TOPM |
|
64 | 98 | 70 | 1,5 | 8 | 2 | 14 | ||
|
30610TOPM |
|
64 | 128 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30611TOPM |
|
70 | 125 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30612TOPM |
|
73 | 124 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30613TOPM |
|
76 | 122 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30505TOPM |
|
80 | 120 | 70 | 1,5 | 10 | 4 | 18 | ||
|
30620TOPM |
|
80 | 150 | 70 | 1,5 | 12 | 4 | 22 | ||
|
30621TOPM |
|
90 | 145 | 70 | 1,5 | 12 | 4 | 22 | ||
|
30622TOPM |
|
98 | 141 | 70 | 1,5 | 12 | 4 | 22 | ||
|
30508TOPM |
|
100 | 140 | 70 | 1,5 | 12 | 4 | 22 | ||
|
30628TOPM |
|
100 | 170 | 70 | 1,5 | 14 | 4 | 26 | ||
|
30629TOPM |
|
115 | 163 | 70 | 1,5 | 14 | 4 | 26 | ||
|
30511TOPM |
|
120 | 160 | 70 | 1,5 | 14 | 4 | 26 |
GH Joist Hanger TOP M Installation aid
Position the patented installation aid at the bottom edge and press lightly on the top locator prongs to fix the joist hanger.
The joist hanger pulls itself from the joist at the bottom edge and is therefore fixed precisely flush and at right-angles.
Installation in the middle of flush at the top If the secondary member is installed in the middle or flush at the top of the main member, both installation aids are pressed directly onto the datum level line.
As a result, the Top M is aligned at right-angles and fixed without additional aids.
Modern fluted profile
Locator prong, the third hand during installation
• Time-saving, fast installation through independent grip
for further use
• Easier installation, e.g. for overhead installation
Ring marking on the nail holes for fast and proper partial
nailing (40 % fewer nails)
Beads
The beads provide additional stability for the joist hangers
for maximum standards (including 2-axial loading)
Approved transverse installation
Joints/connections to German and European approval to:
• Timber-to-timber
• via intermediate layer, e.g- OSB
• only on wood-based panels, e.g. OSB
• Timber-to-concrete, timber-to-steel